New, temporary Amtrak company between , Chicago , and , Florida , will immediately start running as the bridge company gears up for big building along its active Northeast Corridor.
The fresh Floridian trains will work regularly from , Chicago , to , Miami, stopping along the way in , Cleveland,  , Pittsburgh , and , Washington, D. C.  , Service begins , Nov. 10.
The course marks a combination of two existing roads — the , Capitol Limited , between , Chicago , and , Washington, and the Silver Star between , Miami , and , New York , — as Amtrak plans to repair an aged hole under the , East River , in , New York. The design will push one tube of the pipe to similar at a time and Amtrak needed to limit the number of carriages that are fueled, cleaned and serviced in , New York City, so the firm sought choices elsewhere, spokesman , Marc Magliari , said.
Amtrak does n’t had an end time for the new , Chicago , path, but Magliari said it would probably last at least until building on the , East River , hole ends.
” This provides a company that has been much sought in the Midwest”, Magliari said.
The train journey between , Chicago , and , Miami , takes about two weeks, website schedule show. A coach-class ticket cost$ 113 on the Amtrak website Tuesday, while private-room prices began at$ 734. According to Magliari, the new company will contain Amtrak’s newest class of sleeping cars.
Amtrak when operated Floridian railways between , Chicago , and , Miami, but the company ended in 1979 as trail conditions deteriorated and made the train but uncertain that it drove ahead passengers, Magliari said. During a national assessment of Amtrak roads ‘ performance, the company was deemed not to be a high-performing way.
However, there are n’t many similarities between the new way and the original Floridian way. The new station may also start in , Chicago , and offer the same Florida channels, but it will generate various stops between the two destinations. The original Floridian passed through , Indiana,  , Kentucky , and , Tennessee, while included along the new route are  , Toledo,  , Cleveland , and , Pittsburgh, which never had direct Amtrak service to , Florida, Magliari said.
” Our members have had a long-standing dream of restoring a one-seat ride from the Midwest to , Florida, and we’re thrilled that a new generation of American passengers will be able to experience this service for themselves”, said , Jim Mathews, president and CEO of the , Rail Passengers Association, in a statement provided by Amtrak. ” This move will free up desperately needed equipment while putting pressure on Northeast Corridor infrastructure while the ERT Project renovation is underway”
___
© 2024 Chicago Tribune
Distributed by Tribune Content Agency, LLC.